Track laying has now been completed with just a minor
change which was the addition of extra storage loops for the branch
line on the far right corner (which will be out of public view).
Most of the point motors have been installed, all except those
which will include signal operation, these will added once the main
wiring commences.
More scenic work has been completed on the hills and gradients
around the far left corner and the track has now been painted ready
for ballasting. This has been done across all the board joints prior
to the cutting of the track across all the boards so that the layout
could be dismantled (the first time since track laying began). This
enabled Newcastle by the Water to be re-erected to check for running
quality prior to it’s outing to the Beckenham Show in October. Work
has commenced on the assembly of the overhead mainline gantries
produced by N Brass, along with other scenic items.
|