Stafford & Brighton went well; indeed we won
a Gold award at Brighton with Newcastle by the Water.
Fredstone has now been erected again & work continues. A start
has been made on the scenics with the top right hand corner &
the water feature – a favourite of John’s.
Track laying has commenced on the branch with wooden sleepered Code
80 and a change to our original plan has been made to use Code 55
concrete sleepered track on all the main lines resulting in a change
to our shopping list!
Work will again cease whilst Newcastle by the Water is displayed
at Sutton Coldfield during April.
Sutton Coldfield was thoroughly enjoyable & work now continues,
a little hampered by the some of the club members exhibiting their
own layouts at (amongst others) the Bristol, Derby shows.
The water feature has now been sealed & fibre glassed to ensure
it is water proof & further track laying has occurred on the
branch together with a start made on the main lines in the top right
hand corner. Track weathering has been completed on the branch &
we now await 50 bags of ballast from Green Scene (to be collected
at the Derby show) before ballasting can commence. |