OO Gauge - Lawton Hey
Home
About Us
 
Exhibition 2011
 
Club Layouts
Members Layouts
Hassell Harbour Bridge
 
Join/Contact Us
FAQ's
Usefull Links
SEPTEMBER UPDATE
This is the first of (hopefully) monthly updates to keep members and visitors informed of the progress (or lack of it) to the re-build of the ‘00’ gauge group “Lawton Hey” 24 foot by 10 foot centre operated layout.
   
A BIT ABOUT THE GROUP
The group has seen a very healthy and consistent increase in members over the past 12 months or more, and we currently have 21 ‘00’ group members, with around half of us being retired, this has resulted in a very active ‘Monday’ group of around 6 to 8 members, joining together with some of the retired members of the ‘0’ group for a very enjoyable and (dare I say it? …) productive time from around 9:30 am to 3:30pm … (and yes, we even take our lunches with us … just like going out to work !!! but much more enjoyable.)
The skills, interests, and wishes of these members vary widely across most aspects of the hobby with everyone helping everyone else not only on the club layout, but on our own individual layouts as well.
   
WHAT’S BEEN HAPPENING
There has been quite a lot of discussion concerning the layout’s running conditions over previous months/years, and it was felt that the main base boards were getting to the point where they had been ‘hacked around and modified’ so many times they had become too ‘flimsy’ (if that is the right word) to give a reliable and solid foundation for us to produce an exhibition standard layout with good portability etc.
To this end, it was decided that we would re-new all the baseboards in sections over a period of time to a much more sturdy design, the pictures indicate the initial boards that have been modified and replaced.
This replacement operation will continue over months to come.
   
THE MAIN LINE
The UP and DOWN main line tracks have been re-laid on the new baseboards with a foam type underlay which makes for very quiet running and noise reduction.
As we work round the layout replacing the baseboards, the tracks will be re-laid / replaced accordingly to achieve a good running quality.
The main lines (and fiddle yards) are the primary operating sections required for the clubs running nights (these are usually the second Friday in each month, but check the notice boards and website for confirmation.)
THE BRANCH LINE
After long and sometimes heated discussions, with varied opinions and idea’s about what a branch line should be, a final ‘plan’ has at last ‘come together’ which does have some extremely good features and capabilities, where several points (excuse the pun) have been incorporated to produce an extended track area with some nice hidden features that will keep the public guessing as to ‘how did it do that’ or’ where did that come from’ etc.
   
THE GOODS YARD
This is currently in discussion where members are being asked for practical idea’s of the requirements for a suitable goods area adjacent to what will be the main line station, so this is an on-going subject at this time.
   
THE FIDDLE YARDS
The fiddle yards have largely been left unchanged at this time, and will remain unchanged until the baseboards are replaced sometime in the future.
Well, that’s about it for this opening gambit, without giving too much to read through that it becomes boring, and hopefully the next update (planned for October) will go into a little more detail of individual area’s and sections etc.
Back
 
 
Date last modified 5 October 2010
Site Maintained by C Rutherford