Z Gauge - Tiny Town - update
Home
About Us
 
Exhibition 2012
 
Club Layouts
Members Layouts
Hassell Harbour Bridge
 
Join/Contact Us
FAQ's
Usefull Links
TINY TOWN UP DATE 2011-1
The planed modifications to Tiny Town have being completed. The double slip by-pass has worked well giving two way running in opposite directions. We have also re-laid the outer and inner loops to remove an problematic curve. (See new track plan) The inner goods area has been electrically separated from the outer loops, also the entrance has been moved to lengthen the head shunt which as made the goods area self contained, as it no longer requires the use of the inner loop as a head shunt. (See new track plan).

 

New Track Plan

Scenics
The scenic’s are being up dated see the photos.
View of church yard
View of old oil storage
Goods Yard
View of bridge and cave
Goods yard from bridge over river
View towards where castle will be
View down on to bridges over river
View of oil storage be for modification
View of goods yard with cave the source of river
View towards bridges and corner tunnel
View across to the castle
View across to the castle with most of the general scenic’s completed
 
We are still planning to fit sensors and sectionalisation of the outer and inner loops for multiple train running on.
Also planning a new control and display boxes (see figs 1 2 & 3 )
Fig 1
Fig 2
Fig 3
Back
Date last modified 19 March 2011
Site Maintained by C Rutherford